Soil Test of Akhaura-Agartala Railway. The Railway link to Akhawura to Agartala rail line project includes soil test, topographic survey, Gps Survey, Land Acquisition map of the marked area and with test pit in 200m interval, Borehole drilling up to 40m, soil testing and reporting. Client name IRCON & STUP consultants pvt. Ltd. Year 2017