GEL has awarded the Paira Port Jetty work which is a ongoiong investigation work on sea. The scope of work includes:
- Drilling of 21 Nos. of Boreholes upto depth of 100m from the sea bed by using Jack up Barge at a water depth from 10m to 15m.
- Conduct SPT at 1.5m intervals
- Collection of Disturbed Samples by split spoon samplers.
- Collection Undisturbed samples by Thin Walled Shelby Tube.
- Perform Particle Size Distribution, Natural Moisture Content test, Atterberg limit Test, Specific gravity test, Direct Shear Test, Unconfined Compression Strength Test, 1-D Consolidation test, Unconsolidated Undrained Triaxial Test.
- Prepare a Geotechnical investigation Report based on collected data.