Soil Resistivity Survey at Cox’s Bazar

Soil Resistivity Survey at Cox's Bazar

Soil Resistivity Survey at Cox’s Bazar.

Installation of 42” OD High Pressure Natural Gas Transmission Pipeline by Horizontal Directional Drilling
(HDD) method across two rivers (Maheshkhali Channel & Matamuhuri River) and one Khal (Demosia Khal)
on Design, Procurement, Supply, Installation, Testing and Commissioning on Turn-Key (EPC) Basis under
Maheshkhali Anowara Gas Transmission Parallel Pipeline Project.

Client’s Name
The PipeLiners Ltd. &
Punjuloiyed Ltd.

Work Description
22 Nos Boring With Test Report.

Open chat
Hello 👋
Can we help you?