Soil Testing at Matamuhuri River, Moheskhali River & Demushia Khal.
Installation of 42” OD High Pressure Natural Gas Transmission Pipeline by Horizontal Directional Drilling
(HDD) method across two rivers (Maheshkhali Channel & Matamuhuri River) and one Khal (Demosia Khal)
on Design, Procurement, Supply, Installation, Testing and Commissioning on Turn-Key (EPC) Basis under
Maheshkhali Anowara Gas Transmission Parallel Pipeline Project.
Client’s Name
The PipeLiners Ltd. &
Punjuloiyed Ltd.
Work Description
22 Nos Boring With Test Report.